FRXPLM —  Invited Oral: Hadron Accelrators   (24-May-19   10:00—10:30)
Chair: S. Wang, IHEP, Beijing, People’s Republic of China
Paper Title Page
FRXPLM1 Operations Experience of SNS at 1.4MW and Upgrade Plans for Doubling the Beam Power 4380
 
  • J. Galambos
    ORNL, Oak Ridge, Tennessee, USA
 
  In 2018, the SNS begins operation at the design proton beam power of 1.4 MW. This talk will present the critical technical challenges that were overcome in order to take the final step in beam power with a higher than 90% reliability. In addition, the future project of the SNS for doubling the beam power from 1.4 MW to 2.8 MW and construction of second target station will be discussed.  
slides icon Slides FRXPLM1 [22.095 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-FRXPLM1  
About • paper received ※ 13 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)