WEYYPLM —  Contributed Orals: Circular and Linear Colliders   (22-May-19   11:30—12:30)
Chair: P. Bambade, LAL, Orsay, France
Paper Title Page
WEYYPLM1 Status of Early SuperKEKB Phase-3 Commissioning 2255
 
  • A. Morita
    KEK, Ibaraki, Japan
 
  SuperKEKB is an asymmetric energy electron-positron collider for B-meson physics experiment. The beam collision with 3mm vertical beta function at the interaction point is confirmed during prior beam commissioning until July 2018. The next beam commissioning with the inner silicon vertex detectors so called "phase-3 commissioning" will start in March 2019. In the early part of next phase-3 commissioning, we plan to try the collision operation with over 1A stored beam current in order to exceed 1 x 1034 cm-2 s-1 luminosity. We will report the preliminary results of the early stage of the SuperKEKB phase-3 commissioning.  
slides icon Slides WEYYPLM1 [2.570 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEYYPLM1  
About • paper received ※ 15 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEYYPLM2 The 2018 Heavy-Ion Run of the LHC 2258
 
  • J.M. Jowett, C. Bahamonde Castro, W. Bartmann, C. Bracco, R. Bruce, J. Coello, J. Dilly, S.D. Fartoukh, E. Fol, N. Fuster-Martínez, A. Garcia-Tabares, M. Hofer, E.B. Holzer, M.A. Jebramcik, J. Keintzel, A. Lechner, E.H. Maclean, L. Malina, T. Medvedeva, A. Mereghetti, T. H. B. Persson, B.Aa. Petersen, S. Redaelli, B. Salvachua, M. Schaumannpresenter, C. Schwick, M. Solfaroli, M.L. Spitznagel, H. Timko, R. Tomás, A. Wegscheider, J. Wenninger, D. Wollmann
    CERN, Geneva, Switzerland
  • D. Mirarchi
    The University of Manchester, The Photon Science Institute, Manchester, United Kingdom
 
  The fourth one-month Pb-Pb collision run brought LHC Run 2 to an end in December 2018. Following the tendency to reduce dependence on the configuration of the preceding proton run, a completely new optics cycle with the strongest ever focussing at the ALICE and LHCb experiments was designed and rapidly implemented, demonstrating the maturity of the collider’s operating modes. Beam-loss monitor thresholds were carefully adjusted to provide optimal protection from the multiple loss mechanisms in heavy-ion operation. A switch from a basic bunch-spacing of 100 ns to 75 ns was made as the beam became available from the injector chain. A new record luminosity, 6 times the original design and close to the operating value proposed for HL-LHC, provided validation of the strategy for mitigating quenches due to bound-free pair production (BFPP) at the interaction points of the ATLAS and CMS experiments. Most of the beam parameters of the HL-LHC Pb-Pb upgrade were attained during this run and the integrated luminosity goals for the first 10 years of LHC operation were substantially exceeded.  
slides icon Slides WEYYPLM2 [10.884 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEYYPLM2  
About • paper received ※ 08 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEYYPLM3 First Results of the Compensation of the Beam-Beam Effect with DC Wires in the LHC 2262
 
  • G. Sterbini, D. Amorim, H. Bartosik, A. Bertarelli, R. Bruce, X. Buffat, F. Carra, L.R. Carver, G. Cattenoz, E. Effinger, S.D. Fartoukh, N. Fuster-Martínez, M. Gąsior, M. Gonzalez-Berges, A.A. Gorzawski, G.H. Hemelsoet, M. Hostettler, G. Iadarola, O.R. Jones, N. Karastathis, S. Kostoglou, I. Lamas Garcia, T.E. Levens, L.E. Medina Medrano, D. Mirarchi, J. Olexa, S. Papadopoulou, Y. Papaphilippou, D. Pellegrini, M. Pojer, L. Ponce, A. Poyet, S. Redaelli, A. Rossi, B. Salvachua, H. Schmickler, F. Schmidt, K. Skoufaris, M. Solfaroli, R. Tomás, G. Trad, D. Valuch, C. Xu, C. Zamantzas, P. Zisopoulos
    CERN, Geneva, Switzerland
  • D. Amorim
    Grenoble-INP Phelma, Grenoble, France
  • M. Fitterer, A. Valishev
    Fermilab, Batavia, Illinois, USA
  • D. Kaltchev
    TRIUMF, Vancouver, Canada
  • S. Kostoglou
    National Technical University of Athens, Zografou, Greece
  • A.E. Levichev
    BINP SB RAS, Novosibirsk, Russia
  • A. Poyet
    Université Grenoble Alpes, Grenoble, France
 
  The compensation of the long-range beam-beam interactions using DC wires is presently under study as an option for enhancing the machine performance in the frame of the High-Luminosity LHC project (HL-LHC). The original idea dates back more than 15 years. After the installation of four wire prototypes in the LHC in 2018, a successful experimental campaign was performed during the last months. The experimental setup and the main results are reported in this paper.  
slides icon Slides WEYYPLM3 [6.371 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEYYPLM3  
About • paper received ※ 06 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)